Lightweight Corrosion Resistant Aluminum Pressure Plate for Floating Solar PV Mounting Applications

Still deciding? Get samples of $ !
Request Sample

Product Description

📋 Basic Information
Condition New
Certification ISO, CB, CE
Application Home, Industrial, Commercial
Specification Normal, standard
Available Material Carbon Steel, High Strength Steel, Stainless Steel
Process Cold Forging, Hot Forging, Machining
Head Type Hexagon, Hex, Hex Flange Head, Round
Origin China
🛠️ Product Description
Product Name Pressure Plate
Model NO Customizable
Application Fields Photovoltaic bracket, Machinery Chemical Industry, Environmental, Building
Transport Package Bag + Carton + Pallet or Customized
  • High Strength: U-Shaped Double Hole Solar Pressure Plate designed for durability.
  • Corrosion Resistance: Galvanized Steel and Stainless Steel options for PV systems.
  • Precision Engineering: Precision-made components for secure solar panel mounting.
  • Heavy Duty: Suitable for floating solar PV mounting and industrial applications.
Solar Pressure Plate View 1
Solar Pressure Plate View 2
Product Technical Details
Mounting System Application
Production Process
❓ Frequently Asked Questions
Q1: Why choose our solar mounting components?
We offer an experienced engineer team with over 10 years in designing solar PV mounting systems. Our products are known for stable quality, competitive pricing, and fast delivery (7-10 days for standard designs).
Q2: What is your Minimum Order Quantity (MOQ)?
One unit is acceptable. For larger quantities, please contact us for detailed wholesale pricing.
Q3: Can you produce aluminum profiles according to specific drawings?
Yes, we have professional engineers to design CAD drawings and establish molds according to your specific requirements.
Q4: Can I request a sample order?
Absolutely. We welcome sample orders to test and check quality. For standard roof mounting products, we offer free samples in small quantities.
Q5: What is the typical production lead time?
Usually, the lead time is 7 to 10 days. For new custom designs, the timeline will be confirmed after engineering review.
Q6: What are your standard payment terms?
Usually, we accept T/T (30% deposit and the balance paid before shipment). L/C is also acceptable.

Related Products