📊 Basic Specifications
| Model NO. |
Solar mounting bracket |
| Certification |
GB, ISO, TUV, CE |
| Material |
Aluminum Alloy |
| Application |
Industrial |
| Surface Treatment |
Polished |
| Corrosion Resistance |
High Corrosion Resistance |
| Installation Method |
Bolted |
| Transport Package |
Woodencase |
☀️ Product Description
| Product Name |
Solar Panel Mounting Brackets |
| Wind Load |
40m/s Framed Or Frameless |
| Solar Panel Type |
Framed Or Frameless |
| Solar Panel Size |
Any Size |
| Snow Load |
1.4kn |
| Warranty |
Over 25 Years |
| OEM & ODM |
Accept |
🏭 Manufacturing Excellence
Our facility is a rapidly developing photovoltaic component manufacturing enterprise. With a factory area of over 12,000 square meters, we maintain a mature production team and advanced equipment. We specialize in producing aluminum alloy accessories, iron parts, and specialized steel for photovoltaic brackets.
Production Capacity
Over 12,000 sqm dedicated factory space for high-volume supply.
Advanced Technology
Specialized in C-shaped and U-shaped steel for robust mounting systems.
Global Standards
Compliant with DIN, AAMA, AS/NZS, and China GB standards.
❓ Frequently Asked Questions
Q1: Why choose our solar mounting solutions?
We are one of the largest vendors in North China with an excellent reputation. Our experienced engineering team has over 10 years of experience in designing solar PV mounting systems. We offer competitive pricing, stable product quality, and a one-stop shopping service for all mounting accessories.
Q2: What is the minimum order quantity (MOQ)?
One unit is acceptable. For larger quantities, please contact us for volume-based pricing and logistical details.
Q3: Do you offer customized designs based on drawings?
Yes, we have professional engineers who can design CAD drawings and establish molds according to your specific project requirements.
Q4: What certifications and standards do your products meet?
Our products meet DIN, AAMA, AS/NZS, and China GB standards. We can also provide specific certifications based on your local requirements.
Q5: What is the typical production lead time?
The standard lead time is 7 to 10 days. For new custom designs, the timeline will be confirmed after engineering review.
Q6: What are the payment and shipping terms?
Commonly we accept T/T (30% deposit, balance before shipment) and L/C. For packaging, we use shrink films, craft paper, or custom wooden cases per customer requirements.